  1. dollar fashion jewelry wholesale Below is a very detailed construction engineering steel bars tied to hidden acceptance content, which has a very strong directing role in actual work:
    1 Dark column content:
    1.1 The cement slurry on the roots of the pillar root has been cleaned.
    1.2 In order to ensure the accurate position of the main band of the dark column, the fixed -frame control
    1.3 column reinforced bars are bundled:
    1.3.1 The number of column stirrules is determined according to the requirements of the drawing. At 50mm at the end of the tendons, start settings at 50mm.
    1.3.2 Draw the position line of the stirrup on the rib, and then use the buckle method to be tied up from top to bottom.
    1.3.3 The joints of the stirrup should be tied along the pillar standing tendons.
    1.3.4 Dark -column stirrup and wall tendon tie requirements: Dark column stirrup and wall horizontal tendons are staggered more than 20mm, and they must not be together.
    2. Walls, dark columns, linked beam reinforced bars:
    2.1 The cement slurry on the roots of the wall of the wall has been cleaned.
    2.2 Wall reinforcement has been adjusted. The demand is required to be adjusted by 1: 6.
    2.3 Starting tendon requirements:
    2.3.1 The distance between the first wall tendon edge of the dark column is 50mm.
    2.3.2 The first wall of the wall is 50mm from the concrete plate.
    2.3.3 The first stain of the dark column is 30mm from the concrete plate surface.
    2.3.4 The connected beams start 50mm from the stirrup side of the stirrup.
    2.3.5 Link beam stirrup like a column and a stirrup 50mm.
    2.4 Wall vertical tendon cover requirements:
    2.4.1 The length of the overlap is not less than 45D, and there are three horizontal tendons at the overlap. The bundle range is not less than three buckles. The wall ribs are staggered by 50%, and the staggered distance is not less than the 1.3 times overlap length of the adjacent connector.
    2.4.2 Wall horizontal tendon nodes require adjacent tie joints to staggered.
    2.5 Vertical ladder tendon Requirements:
    2.5.1 Made of steel bars with a size larger than wall tendons to replace vertical tendons.
    2.5.2 Top mold tendon is equal to the wall thickness of 2mm. The length of 250mm, 300mm, and 350mm thick wall mold should be 248mm, 298mm, and 348mm.
    2.5.3 The length of the ends of the top-to-end tendon to the end is the horizontal tendon protective layer plus the horizontal tendon diameter and the diameter is 1mm. The roots are 3. The top mold is brushed the rust -proof paint.
    2.5.4 The length of the non -top mold is the diameter of the horizontal tendon.
    2.5.5 Each wall vertical ladder tendon is required to be 1 meter, and each wall is 2 or more than 2 or more. The same standard height is required and tied in place.
    2.6 Horizontal ladder tendon Requirements:
    2.6.1 Made with short -toast steel bars.
    2.6.2 The horizontal ladder tendons are made according to the figure and conforms to the steel bars of the wall, and the special wall is dedicated. 2.6.3 The wall tendon is tied to 300mm above the wall template mouth, and is tied in place.
    2.7 Pillar fixed distance box:
    2.7.1 Requires accurate production and firmly tied.
    2.8 Protective layer requirements:
    2.8.1 walls, columns, and beams use plastic pads to meet the thickness of the protective layer, the diameter and intensity requirements of the steel bar.
    2.8.2 Set the spacing of 600mm × 600mm, which is layout of plum blossoms.
    2.8.3 beams and column tendons are set on the main tendon, and the wall of the wall tendon is set on the wall horizontal tendon.
    2.9 The requirements for stirrup:
    2.9.1 The hook must be parallel, and the hook angle is 135. Essence
    2.9.2 The straight part is 10D, and the two are consistent.
    2.9.3 Bending heart is in line with the diameter of the main tendon, and is tied to the main tendon in place.
    2.9.4 four angles on the same plane.
    2.9.5 is firmly tied.
    2.9.6 The opening of the column stifier is located in four corners, respectively.
    2.9.7 The diameter of the column and beam stirrup requires the diameter, and the distance meets the design requirements. If the stirrup is required to be encrypted, the spacing is controlled at 5D and 10cm. That is, it is more than φ20 controlled by 10cm and less than φ20 controlled by 5D.
    2.9.8 The requirements of the beam stirrup are not inclined, the distance is uniform, and the opening is set on both sides of the upper part.
    2.9.9 Single hoop is set according to the requirements of the drawing, and the hook is 135. The straight length is 10d.
    2.10 Cave mouth adding muscles:
    The on the cutting of the wall of the hole with three -sided opening stifi. And add muscles according to the drawings.
    2.11 connected beam steel bars anchor:
    2.11.1 The length must meet the design and specification requirements.
    2.12 The main tendon of the beam must be located in the four corners of the stirrup. The two rows of the main tendon spacing is less than or equal to 25mm in diameter.
    3. Top plate reinforcement:
    3.1 control before the plate tendon is tied:
    3.1.1 The wall muscles, beams and tendons and construction gap cement slurry has been cleaned.
    3.1.2 Set the horizontal ladder tendon and dark column fixed distance box. The above items must not be tied up.
    3.2 The size of the mesh eyes must not exceed 10mm.
    3.3 The first panel tendon is 50mm from the side of the wall.
    3.4 Tied wire requirements:
    3.4.1 The upper tendons are tied to the bottom, the lower tendons are tied to the filament, and the steel bars are perpendicular to the reinforcement.
    3.4.2 The length of the tie's head is basically the same, and the length does not exceed 50mm.
    3.4.3 The adjacent tied wire is "eight" buckle.
    3.5 concrete plate surface reinforcement:
    3.5.1 is not allowed to welded with an arc.
    3.5.2 When there is a wire tube, the "Z" -shaped steel bars should be tied firmly.
    3.6 The steel stools between the double -layer mesh.
    3.6.1 Setting spacing is not greater than 1 meter, and the height meets the protective layer requirements, and the production meets the requirements.
    3.6.2 Horse stool height = board thick-protective layer × 2- two rows of steel diameter.
    3.7 The top board of the protective layer is 15mm, the beam tendon is 25mm, and the deviation cannot exceed 3mm.
    3.8 Board reinforcement block:
    3.8.1 Plastic pads, thickness and strength meet the protection layer requirements.
    3.8.2 The spacing of the cushion is not more than 600mm, and the plum -shaped settings.
    3.9 The reserved hole of the plate surface. The diameter of the surrounding reinforcement retention is greater than 200mm and less than 300mm.
    3.10 Reinforcement end -end anchor requirements: Anchor to the side of the vertical tendon.

  2. js copti wholesale jewelry Below is a very detailed construction engineering steel bars tied to hidden acceptance content, which has a very strong directing role in actual work:
    1 Dark column content:
    1.1 The cement slurry on the roots of the pillar root has been cleaned.
    1.2 In order to ensure the accurate position of the main band of the dark column, the fixed -frame control
    1.3 column reinforced bars are bundled:
    1.3.1 The number of column stirrules is determined according to the requirements of the drawing. At 50mm at the end of the tendons, start settings at 50mm.
    1.3.2 Draw the position line of the stirrup on the rib, and then use the buckle method to be tied up from top to bottom.
    1.3.3 The joints of the stirrup should be tied along the pillar standing tendons.
    1.3.4 Dark -column stirrup and wall tendon tie requirements: Dark column stirrup and wall horizontal tendons are staggered more than 20mm, and they must not be together.
    2. Walls, dark columns, linked beam reinforced bars:
    2.1 The cement slurry on the roots of the wall of the wall has been cleaned.
    2.2 Wall reinforcement has been adjusted. The demand is required to be adjusted by 1: 6.
    2.3 Starting tendon requirements:
    2.3.1 The distance between the first wall tendon edge of the dark column is 50mm.
    2.3.2 The first wall of the wall is 50mm from the concrete plate.
    2.3.3 The first stain of the dark column is 30mm from the concrete plate surface.
    2.3.4 The connected beams start 50mm from the stirrup side of the stirrup.
    2.3.5 Link beam stirrup like a column and a stirrup 50mm.
    2.4 Wall vertical tendon cover requirements:
    2.4.1 The length of the overlap is not less than 45D, and there are three horizontal tendons at the overlap. The bundle range is not less than three buckles. The wall ribs are staggered by 50%, and the staggered distance is not less than the 1.3 times overlap length of the adjacent connector.
    2.4.2 Wall horizontal tendon nodes require adjacent tie joints to staggered.
    2.5 Vertical ladder tendon Requirements:
    2.5.1 Made of steel bars with a size larger than wall tendons to replace vertical tendons.
    2.5.2 Top mold tendon is equal to the wall thickness of 2mm. The length of 250mm, 300mm, and 350mm thick wall mold should be 248mm, 298mm, and 348mm.
    2.5.3 The length of the ends of the top-to-end tendon to the end is the horizontal tendon protective layer plus the horizontal tendon diameter and the diameter is 1mm. The roots are 3. The top mold is brushed the rust -proof paint.
    2.5.4 The length of the non -top mold is the diameter of the horizontal tendon.
    2.5.5 Each wall vertical ladder tendon is required to be 1 meter, and each wall is 2 or more than 2 or more. The same standard height is required and tied in place.
    2.6 Horizontal ladder tendon Requirements:
    2.6.1 Made with short -toast steel bars.
    2.6.2 The horizontal ladder tendons are made according to the figure and conforms to the steel bars of the wall, and the special wall is dedicated. 2.6.3 The wall tendon is tied to 300mm above the wall template mouth, and is tied in place.
    2.7 Pillar fixed distance box:
    2.7.1 Requires accurate production and firmly tied.
    2.8 Protective layer requirements:
    2.8.1 walls, columns, and beams all use plastic pads, which meet the thickness of the protective layer, the diameter and strength of the reinforced steel bar

  3. linen jewelry pouches wholesale Below is a very detailed construction engineering steel bars tied to hidden acceptance content, which has a very strong guiding effect on actual work:
    1 Dark column content:
    1.1 The cement slurry on the roots of the pillar root has been cleaned.

    1.2 In order to ensure the accurate position of the main bolt of the dark column, the fixed -frame control 1.3 column reinforced bars are tied:
    1.3.1 The number of column stirrup determines according to the requirements of the drawing. 50mm from both ends start setting. The demand is required to be adjusted by 1: 6. The wall ribs are staggered by 50%, and the staggered distance is not less than the 1.3 times overlap length of the adjacent connector. The top mold is brushed the rust -proof paint. The above items must not be tied up. The joints must be tightened, so that the two reinforced heads should be tightened or locked at the center of the sleeve. The sequence of the tie is the first step and then the platform.

    17
    The signal worker when the steel bars are lifted should be directed when there is no person in the pile.

    19 The excess of the leftovers of the installation class must be returned to the production class and fulfill the signature procedures.